Modular classrooms

A modular classroom is built as modules in a factory, craned on to prepared foundations and fitted out on site in days rather than months. Schools, trusts and councils use them for extra places, SEN bases, decant space and replacements for tired mobiles. Here are the published figures to buy new, buy refurbished or hire, the room sizes and rules that apply, and a programme that works back from September.

Free, with no obligation. Nobody contacts you until you say yes.

A free matching service, not a modular building supplier. We find one who covers your area and tell you who they are before anything is shared. How it works

New single classroom
From £108,000Building only. Double from £180,000
Refurbished single
From £82,000Double from £136,800
Hire, single classroom
From £275 a week64 m², open plan
Time on site
1 to 2 working daysThen 5 to 7 working days to fit out
Excluding VAT. Groundworks, crane and delivery are extra. A guide, not a quote.Sources read October 2026: price guide, hire rate, installation times

Working back from September

A typical programme for a classroom that must be in use for the autumn term. The supplier's time on site is the short bar at the end; the long lead is in the brief, the quotes and any planning decision.

Task
NovDecJanFebMarAprMayJunJulAugSep
CIF bid, if eligibleCloses 15 December 2026
Brief, numbers and budgetRooms, toilets, date, funding
Survey and supplier returnsThree like-for-like prices
Planning applicationOnly if needed: 8 to 12 weeks
Order and design sign-offLayout and finishes fixed
Manufacture and groundworksRun side by side
Crane in and fit-out1 to 2 working days, then 5 to 7 working days

Typical stageOnly if a planning application is neededStart of the autumn term

Durations from published supplier timetables: planning 8 to 12 weeks, 12 to 24 weeks end to end, installation and fit-out. CIF dates from the DfE application page. Illustrative, not a programme for your site.

Buy new, buy refurbished or hire

Starting prices for a single classroom, building only, before VAT and site costs. The right route depends on how long you need the room and which budget pays for it.

RouteSingle classroomDouble classroomWhat you getLead timeSuits
Buy newFrom £108,000From £180,000Built to your layout; can be permanentFactory slot plus groundworksRooms needed for good
Buy refurbishedFrom £82,000From £136,800Existing stock, refurbished to orderOften shorter: no manufactureSeveral years, tighter capital
HireFrom £275 a weekPriced per unitSupplier owns and maintains itMinimum terms, one supplier 26 weeksOne to three years, revenue budget
Purchase prices from Midlands Portable Buildings, April 2026, building only; hire from Elite Systems GB. Read 28 October 2026. We are not connected to either firm.

Build a full budget in the calculator

The buildings schools ask for

The same factory methods make every one of these. What changes is the layout, the fit-out and how long the building is meant to stay.

  • Modular school buildings

    Teaching blocks, halls, toilets and offices, single or two storey, permanent or relocatable.

  • Temporary classrooms

    For a bulge year, a decant or the gap before a permanent scheme. Usually hired, with a time-limited planning permission.

  • Portable and mobile classrooms

    Relocatable units built to be lifted out and used again, today insulated and heated to current standards.

  • Prefab classrooms

    Factory-built rooms assembled on site in days, in steel frame, timber frame or panel systems.

  • SEN classrooms

    Inclusion bases and resourced provision with quiet rooms, hygiene facilities and their own entrance.

  • Modular nursery buildings

    Self-contained early years settings sized to the EYFS space rules, with doors straight on to outdoor play.

How big each room should be

Size the brief from the DfE area guidelines, not from a supplier's standard unit. Building Bulletin 103 (June 2014) covers mainstream schools, Building Bulletin 104 covers SEND and alternative provision, and the EYFS framework sets nursery space per child.

Toilets, stores, a lobby and circulation come on top of these teaching areas.

RoomFloor areaNoteGuidance
Primary classroom, 30 pupils55 to 62 m²Standard class baseBB103
Reception classroom, 30 pupils62 m²Larger, for practical workBB103
Secondary general classroom, 30 pupils55 m²Seminar room for 22: 41 m²BB103
Small group roomAbout 9 m²Up to four pupils; one per 150 placesBB103
Nursery, three to five-year-olds2.3 m² a childTwos 2.5 m², under twos 3.5 m²EYFS
SEN and alternative provisionBy needLarger per pupil, with quiet and hygiene roomsBB104

What public buyers have paid

Values as published on public contract notices. Whole projects vary more than starting prices suggest, because toilets, groundworks, services and moving costs sit inside these totals. We do not name the suppliers.

BuyerWhat was boughtRouteDateValue
Coventry City CouncilSupply and install a double classroom modular unit with associated facilities, Moseley Primary SchoolBuy, newJanuary 2024£427,000
Hampshire County CouncilMove and reinstall a double classroom modular building between two schoolsRelocateMay 2025£419,686
Northern Ireland Housing ExecutiveA single-storey turnkey modular classroom for a training facility (estimated value at tender)Buy, newJune 2025£180,000
Harris FederationModular classrooms at one academy (works contract)BuyMay 2022£160,000
Stockton-on-Tees Borough CouncilHire of three temporary classrooms and a toilet block, with groundworks and installation, about 13 monthsHireMay 2024£347,128
The City of Liverpool CollegeTwo modular classrooms on four years’ hire, with delivery, installation and groundworksHireAugust 2025£53,118
Cumbria County CouncilModular classrooms to add pupil places at five schoolsBuyMarch 2018£348,708
From Contracts Finder, Find a Tender and a public notice listing, read 28 October 2026. The Northern Ireland figure is the estimate at tender.

Tell us the rooms, the site and the date, and we will find a modular building supplier who covers your area.

Ask for prices

Planning, regulations and funding

The four things that decide whether a September date is realistic. General guidance, not legal or procurement advice.

Permanent or temporary: the planning difference

Planning (England)
Class M permitted development lets schools add buildings within limits: since 21 April 2021, the greater of 25% of the existing footprint or 250 m²; 5 m high within 10 m of the boundary, 6 m elsewhere; nothing within 5 m of homes; no lost playing field; nothing in the curtilage of a listed building. A temporary classroom for a bulge year usually needs an application. Wales, Scotland and Northern Ireland have their own rules.
Building regulations
Needed for any classroom that stays more than 28 days. The temporary building exemption covers 28 days and nothing longer, so a hired unit needs approval too.
Condition Improvement Fund
The 2027 to 2028 round closes at 12 noon on 15 December 2026, with outcomes expected in May 2027. It is for condition first; only a very small share goes to expansion, and only for high-performing eligible schools. Project limits run from £20,000 (primary) or £50,000 (secondary) to £4,000,000.
Procurement
Follow your trust or council financial regulations. At these values most require three written quotes, a tender or a call-off from a framework. Ask suppliers to price the same written brief.

How our service works

We are a free matching service, not a supplier. A supplier we introduce may pay us a fee; you pay nothing for the introduction.

  1. Send the brief

    Postcode, building, buy or hire, date, funding and site access. About two minutes.

  2. We find a supplier

    One who covers your area and does this kind of school work, named to you within one working day.

  3. You decide

    Your details go to that supplier only if you say yes. Nothing is shared before that.

  4. Survey and price

    They visit, check access and services, and send a written price to set beside your other quotes.

Questions schools ask

How much does a modular classroom cost?

A published UK price guide starts new single classrooms at £108,000 and doubles at £180,000, building only and before VAT; refurbished units start at £82,000 and £136,800. Groundworks, crane hire, delivery and service connections are extra. Our cost guide and calculator builds a full budget.

How long does it take to get a modular classroom?

Allow 12 to 24 weeks from first enquiry to handover for a typical project, and longer if a planning application is needed (8 to 12 weeks for a decision). The time on site is short: one supplier allows 1 to 2 working days to crane the modules in, then 5 to 7 working days of fit-out.

Do modular classrooms need planning permission?

A permanent classroom on a school site in England may be permitted development under Class M, within the limits on footprint, height and distance from homes. Temporary classrooms usually need an application. Check with your planning authority before you order.

Should we buy or hire?

It turns on how long you need the room and which budget pays. Hire starts at £275 a week for a single classroom, about £14,300 a year before extras, and is usually revenue. Buying refurbished starts at £82,000 and is capital. Past about five or six years, buying usually costs less.

Can CIF pay for a new modular classroom?

Rarely. The Condition Improvement Fund puts compliance, health and safety and condition first, and only a very small share goes to expansion for high-performing eligible schools. Replacing a failing mobile classroom can be a condition case. Read our CIF guide.

How big is a modular classroom?

Building Bulletin 103 gives 55 to 62 m² for a primary class of 30 and 55 m² for a secondary general classroom. Modules are typically about 3 m wide, so a single classroom is several modules joined, with toilets and a lobby on top.

Are you a modular building supplier?

No. We are a free matching service. We look for one supplier working in your region who suits the job, name them to you, and share your details only once you agree.